Umbwe Route
Climb Kilimanjaro on the Umbwe Route

Umbwe Route - Kilimanjaro – 5/6 days

Umbwe route is one of the shortest and thus one of the fastest ways to get to the glaciers. It is well known for its caves, which can be visited during the ascent. However it poses a challenge, the hazard of crossing the Western Breach, a very volatile area with frequent landslides. Due to their demanding conditions and arduousness, it is one of the least used routes by hikers who want to reach the summit of Kilimanjaro. Therefore, this route is not done often. Umbwe route, like Machame and Lemosho as are described herein, reaches the top of the Kibo crater at Stella Point, while Marangu or Rongai do it at Gilman's Point.
  • Day 1: Umbwe Gate (1.700m) – Umbwe Camp (2.900m)
  • Day 2: Umbwe Camp – Barranco Camp (3.976m)
  • Day 3: Barranco Camp – Karanga Camp (3.995m)
  • Day 4: Karanga Camp – Barafu Camp (4.673m)
  • Day 5: Barafu Camp – Uhuru Peak (5.895m) – Mweka Camp (3.068m)
  • Day 6: Mweka Camp – Mweka Gate (1.640m)
Comparte / Share
Share on FacebookShare on LinkedInTweet about this on TwitterPin on PinterestShare on Google+Email this to someone
  • When to go: The best time to climb Kilimanjaro from the climatological point of view is during the warmest and driest months (January, February and September). June, July and August are also good months, although the weather may be more variable. On the other hand, one must bear in mind that it is at this time is when we find more mountaineers. Machame usually presents an intermediate influx situation, specifically during those periods of higher attendance.
  • Climate: One of the main reasons for not successfully completing the ascent of Kilimanjaro is the so-called "altitude sickness" that may occur in some people when climbing heights 3,500m above sea level, without allowing time to your body to adapt. To prevent the possible effects of altitude, we recommend that hikers extend their trip by an extra day. This acclimatization day is invested in taking several walks up and down, thereby accustoming the body to height. Another possibility for a good acclimatization is to do the Mont Meru climb (4,566m) before climbing Kilimanjaro.
  • Luggage: It should be noted that porters carry 15 Kg at the most. In case of excess baggage, another porter must be hired, which means an extra cost for the client. This usually happens on very special cases, the extra baggage not necessary for the ascension can be left in the hotel. List of recommended materials to be necessary to be taken on the ascent. Click here for the full list of clothing, equipment and essential documentation.

It includes:

  • Transportation from the airport or hotel
  • Entrance fee to the Kilimanjaro National Park according to the length of the route
  • Professional English or Spanish speaking guide
  • Porters and cook
  • Three daily meals and water
  • Tents and mats
  • Oxygen bottle and pulse oximeter for the group

Excludes:

  • Soft drinks and alcoholic beverages
  • Does not include travel insurance
  • Visa or visa fees
  • Gratuities (approximately 10% of the price)

Optional:

  • Accommodation in Moshi
 

Leave a review